Notice:
The advice given on this site is based upon individual or quoted experience, yours may differ.
The Officers, Staff and members of this site only provide information based upon the concept that anyone utilizing this information does so at their own risk and holds harmless all contributors to this site.
Believe me Tom, the skipper is under lots pressure to cast off at the first high tide and whip that sad looking bunch into shape but... only after having completed the following chores. You know the feeling... April 2006 To Do list
Boat Preparation 1) Wash inside of boat with crew 2) Change engine oil and check leg for oil 3) Load boats inventory, beds stuff, blankets, galley stuff 4) Alter/raise aft mast support system to accept fully opened hatch 5) Design,blueprint & order seat for stern railing accept new BBQ 6) Trailer & test the boat to SS workplace for fitting of new additions 7) Take battery on board and test all electrical connections & systems 8) Buy 2 new spark plugs and exchange (keep old as spare) 9) Order new Honda 2 hp extended shaft 10) Finish dingy cover support bar 11) Sow & glue the dingy tarp including grommets placement 12) Buy and install shock cord for dingy’s tarp 13) Replace last years ships fuel in all 4 containers and buy new 14) Finish installing the propane canister with Velcro strap in galley 15) Test stove attached to new propane fuel system 16) Replace the 1500 lb hitch cranker (old one was damaged last year) 17) Store and test mast raising system with gin pole (check all parts 18) Strap turnbuckles together, port & starboard sides (Arlyn’s recomm) 19) Wax the entire boat 20) Clean & wax topsides 21) Take ground tackle on board and secure the bitter end 22) Oil entire teak interior 23) Install porta potty 24) Take on water and clean/test water system 25) Glue sonar transducer container in well housing and test system 26) Buy and take on board ship’s staples and 2 weeks food supply 27) Take on 1 month supply bottled water and store under V berth 28) Take on camping equipment & tent and large green umbrella 29) Store two rainbow colored golf umbrellas 30) Check all tools and spares and take on board 31) Up load all electronic equipment 32) Buy large supply of AA batteries 33) Take on ships papers and documentation 34) Select charts, harbour and way point books for Gulf & San Juan’s 35) Select & take on reading material & literature etc. 36) Install flag pole on stern 37) Check trailer’s break fuel level and buy spare DOT 5 break fluid 38) Test new propane sniffer alarm installation 39) Test all navigation equipment 40) Test safety systems, life jackets etc. 41) Take on wood carving, hobby, games and relaxation stuff 42) Sun shower 43) Dozen floral LED lights
Garden and outside work Apply moss killer Rake/bag moss Seed bare grass spots Fertilise the lawn Order bark mulch & weed killer and spread around the house Trim trees in front and the back of the house Pressure wash driveway, balconies, gutters, glass and railings
Notice: The advice given on this site is based upon individual or quoted experience, yours may differ. The Officers, Staff and members of this site only provide information based upon the concept that anyone utilizing this information does so at their own risk and holds harmless all contributors to this site.